Cobb's Quay Marina

WFBA were appointed to design a new boat storage facility. The initial ground survey revealed poor ground conditions on site where new 50m of sea wall was built. WFBA overcame these problems through the use of a formwork system to cap the piling, and 2000sq metres concrete slab to carry. The racking system was then erected on a concrete raft foundation.

LOCATION

Poole, Dorset

ARCHITECT

TS Design

CLIENT

Marina Developments Ltd.